DocumentCode :
2188132
Title :
Scheduling method with the consideration of machine setup in flexible manufacturing systems
Author :
Yim, Seong Jin ; Lee, Doo Yong
Author_Institution :
Dept. of Mech. Eng., Korea Adv. Energy Res. Inst., Daejeon, South Korea
Volume :
4
fYear :
1997
fDate :
20-25 Apr 1997
Firstpage :
2735
Abstract :
A scheduling method that uses Petri net modeling and heuristic search is extended to handle the tool setup. The machine setup is to attach a tool to a particular machine and detach the tool from the machine, and this is a time-consuming activity. The processing time of operations varies according to the attached tool and the machine used. The method proposed in this paper uses timed-transition Petri net to model these features and applies a search algorithm to the reachability of the Petri net model to generate an optimal or near-optimal schedule. In addition, this method can determine how many tools are needed in order to reduce the makespan. Search algorithm employs an evaluation function to guide the search procedure. New heuristic functions are developed for efficient search. The experimental results that show the effectiveness of the proposed method are presented
Keywords :
Petri nets; flexible manufacturing systems; optimisation; production control; resource allocation; search problems; FMS; Petri net modeling; evaluation function; flexible manufacturing systems; heuristic search; machine setup; reachability; scheduling; tool setup; Delay effects; Discrete event systems; Feedback; Flexible manufacturing systems; Job shop scheduling; Manufacturing systems; Mechanical engineering; Petri nets; Routing; Scheduling algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation, 1997. Proceedings., 1997 IEEE International Conference on
Conference_Location :
Albuquerque, NM
Print_ISBN :
0-7803-3612-7
Type :
conf
DOI :
10.1109/ROBOT.1997.606700
Filename :
606700
Link To Document :
بازگشت