DocumentCode
2188132
Title
Scheduling method with the consideration of machine setup in flexible manufacturing systems
Author
Yim, Seong Jin ; Lee, Doo Yong
Author_Institution
Dept. of Mech. Eng., Korea Adv. Energy Res. Inst., Daejeon, South Korea
Volume
4
fYear
1997
fDate
20-25 Apr 1997
Firstpage
2735
Abstract
A scheduling method that uses Petri net modeling and heuristic search is extended to handle the tool setup. The machine setup is to attach a tool to a particular machine and detach the tool from the machine, and this is a time-consuming activity. The processing time of operations varies according to the attached tool and the machine used. The method proposed in this paper uses timed-transition Petri net to model these features and applies a search algorithm to the reachability of the Petri net model to generate an optimal or near-optimal schedule. In addition, this method can determine how many tools are needed in order to reduce the makespan. Search algorithm employs an evaluation function to guide the search procedure. New heuristic functions are developed for efficient search. The experimental results that show the effectiveness of the proposed method are presented
Keywords
Petri nets; flexible manufacturing systems; optimisation; production control; resource allocation; search problems; FMS; Petri net modeling; evaluation function; flexible manufacturing systems; heuristic search; machine setup; reachability; scheduling; tool setup; Delay effects; Discrete event systems; Feedback; Flexible manufacturing systems; Job shop scheduling; Manufacturing systems; Mechanical engineering; Petri nets; Routing; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 1997. Proceedings., 1997 IEEE International Conference on
Conference_Location
Albuquerque, NM
Print_ISBN
0-7803-3612-7
Type
conf
DOI
10.1109/ROBOT.1997.606700
Filename
606700
Link To Document