• DocumentCode
    2191489
  • Title

    Analysis of Priority of Engineering Project Management Objective System

  • Author

    Wen, Yanfang

  • Author_Institution
    Sch. of Archit. & Civil Eng., Xi´´an Univ. of Sci. & Technol., Xi´´an, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    It is very important to determinate the objective system priority that affects the realization of project general objective. In this research Analytic Hierarchy Process is introduced into analyzing the relationship of three objectives from the questionnaire data collected by the experts. Priority of three objectives is identified, which is the quality as first, time and cost next. The result of this research can help to determinate objective system reasonablely, carry out the project smoothly and improve management level.
  • Keywords
    decision making; project engineering; project management; analytic hierarchy process; objective system priority; project engineering; project general objective; project management objective system; Chromium; Construction industry; Educational institutions; Hydroelectric power generation; Investments; Object recognition; Project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5577948
  • Filename
    5577948