DocumentCode :
2192250
Title :
Guaranteeing Optional Task Completions on (m,k)-Firm Real-Time Systems
Author :
Evequoz, Claude
Author_Institution :
Univ. of Appl. Sci. Western Switzerland, Yverdon-les-Bains, Switzerland
fYear :
2010
fDate :
June 29 2010-July 1 2010
Firstpage :
1772
Lastpage :
1779
Abstract :
Previous preemptive real-time (m,k)-firm schedulers all try a best effort policy to dispatch k-m executions when m out of k consecutive task executions have met their deadlines. These additional executions can only bring value to the system if no firm deadline is missed. In this paper we present a framework whereby an on-line feasibility test is carried out on these k-m executions before dispatching them. With our scheme, all dispatched tasks are guaranteed to meet their deadlines.
Keywords :
job shop scheduling; real-time systems; guaranteeing optional task completions; k-m executions; real-time systems; Delta modulation; Dynamic scheduling; Real time systems; Schedules; Scheduling algorithm; Time factors; (m; Firm deadlines; k)-firm real-time scheduling; on-line feasibility test;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer and Information Technology (CIT), 2010 IEEE 10th International Conference on
Conference_Location :
Bradford
Print_ISBN :
978-1-4244-7547-6
Type :
conf
DOI :
10.1109/CIT.2010.308
Filename :
5577977
Link To Document :
بازگشت