DocumentCode :
2192697
Title :
Optimal placement of phase shifters considering contingencies
Author :
Aygen, Z. Elif ; Abur, Ali
Author_Institution :
Dept. of Electr. Eng., Texas A&M Univ., College Station, TX, USA
fYear :
2004
fDate :
6-10 June 2004
Firstpage :
292
Abstract :
This paper presents an approach, which allows the optimal placement of thyristor controlled phase shifters (TCPS) to maximize the system loadability, not only for the base case network topology but also under important contingencies using the dc power flow model. The problem formulation follows that of Lima, FGM, et al. (2003) but extends its results to the case of contingencies. IEEE 30 bus is used as an example to demonstrate the effectiveness of the described method.
Keywords :
integer programming; linear programming; load flow; network topology; phase shifters; thyristor applications; dc power flow model; network topology; phase shifters placement; system loadability; thyristor controlled phase shifter; Linear programming; Load flow; Mathematical model; Network topology; Optimal control; Phase shifters; Power industry; Power system modeling; Power systems; Thyristors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1372801
Filename :
1372801
Link To Document :
بازگشت