Abstract
Summary form only given. When the blackout occurred on August 14, 2003 it was completely unexpected. On August 15, 2003 President Bush and Prime Minister Chretien established a Joint US-Canadian Power Outage Task Force to investigate cause and to make recommendations about how to avoid future occurrences. The task force created three working groups to perform the actual investigation. In this talk we report on the structure and activities of the Electric System Working group.
Keywords
power system faults; power system reliability; Electric System Working group; Joint US-Canadian Power Outage Task Force; blackout investigation; Anatomy; Joints;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location
Denver, CO
Print_ISBN
0-7803-8465-2
Type
conf
DOI
10.1109/PES.2004.1372866
Filename
1372866
Link To Document