• DocumentCode
    2195893
  • Title

    Backup in an ISO/RTO environment

  • Author

    Willson, James ; Clarke, Joseph

  • fYear
    2004
  • fDate
    6-10 June 2004
  • Abstract
    This paper focuses on the special challenges faced in providing emergency backup for an ISO/RTO control center. This paper describes the architecture conceptual design of the main components of the PJM "duplicate control center" as well as the implementation of that design into a working backup facility. The paper identifies key elements that are considered in the development of the PJM backup approach. Those elements are as follows: 1) real time communications, 2) EMS, 3) eSuite applications and MSET, 4) database management systems, 5) networks, 6) application data integration, and 7) facility testing and operator training. The presentation discusses the planning aspects for backup requirements and the determination of location, system monitoring expectations, and actual implementation of the facility.
  • Keywords
    emergency power supply; power engineering computing; power system measurement; power system planning; EMS; ISO/RTO control center; MSET; PJM; data integration; database management systems; eSuite applications; emergency backup planning; facility testing; operator training; real time communications; system monitoring; Business continuity; Communication system control; Database systems; ISO; Lifting equipment; Management training; Medical services; Personnel; Power systems; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2004. IEEE
  • Print_ISBN
    0-7803-8465-2
  • Type

    conf

  • DOI
    10.1109/PES.2004.1372934
  • Filename
    1372934