DocumentCode
2196694
Title
Improved distribution system utilization and expansion through distributed generator placement
Author
Shiqiong Tong ; Yiming Mao ; Miu, Karen
Author_Institution
Electr. & Comput. Eng. Dept., Drexel Univ., Philadelphia, PA, USA
fYear
2004
fDate
6-10 June 2004
Abstract
Summary form only given. This panel summary addresses generation expansion and network upgrades in distribution systems. Specifically, as load levels increase and increased reliability is required for select customers, the installation of distributed generation may be used to address these challenges. The careful placement of distributed generators (DG) may allow for system capacity release within the distribution network and the deferral of equipment upgrades and new construction. In addition, distributed generators will directly affect load changes experienced by transmission systems and their subsequent expansion planning requirements. Another consideration in distribution systems is that, currently, the reliability of the distribution system is highly dependent on the transmission system. It is envisioned that allowing DGs to operate during distribution system outages, caused by both distribution and transmission system faults, would lessen this dependency. In order to achieve this, network enhancements, e.g. switch placements, must be made. Specifically, we present a cost-based problem formulation which may be readily used by intelligent system methods to quantify the effects of DG placements on distribution systems under load increases and distribution faults. We formulate the distributed generator placement problem as a non-differentiable optimization problem subject to electrical, operational and network constraints. In the objective function, we consider the following factors: wheeling costs, DG operating costs, DG installation costs, network upgrade costs and outage costs. Here, we consider the possibility of allowing a DG to support an isolated area during system outages and the network switch upgrades required to enable loads to be supported.
Keywords
distributed power generation; power distribution faults; power distribution planning; power distribution reliability; cost-based problem formulation; distributed generator placement; distribution faults; distribution system reliability; distribution system utilization; subsequent expansion planning; transmission system faults; transmission systems; Computer network reliability; Computer networks; Constraint optimization; Cost function; Distributed computing; Distributed control; Distributed power generation; Intelligent systems; Reliability engineering; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location
Denver, CO
Print_ISBN
0-7803-8465-2
Type
conf
DOI
10.1109/PES.2004.1372970