• DocumentCode
    2200171
  • Title

    Load forecast uncertainty consideration in generating unit preventive maintenance scheduling for single systems

  • Author

    El-Sheikhi, Farag Ali ; Billinton, Roy

  • Author_Institution
    Arabian Gulf Oil Co., Tripoli, Libya
  • fYear
    1991
  • fDate
    3-5 Jul 1991
  • Firstpage
    241
  • Lastpage
    245
  • Abstract
    One basic element in power system planning is the determination of how much generating capacity is required to give a reasonable assurance of satisfying the load requirement. The authors present a new technique based on the statistical moments and cumulants for incorporating load forecast uncertainty into the algorithm for maintenance scheduling in single systems. The proposed algorithm has been implemented in a fast and flexible computer program which has been applied to the IEEE Reliability Test System (RTS) and the Saskatchewan Power Corporation
  • Keywords
    load forecasting; maintenance engineering; power engineering computing; power stations; power system planning; scheduling; statistical analysis; Canada; algorithm; cumulants; generating capacity; generating unit preventive maintenance scheduling; load forecast uncertainty; moments; power system planning; statistical analysis, power engineering computing;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Probabilistic Methods Applied to Electric Power Systems, 1991., Third International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-513-3
  • Type

    conf

  • Filename
    151855