DocumentCode :
2202194
Title :
Interconnection testing of distributed resources
Author :
Kroposki, Benjamin ; Basso, Thomas ; DeBlasio, Richard
Author_Institution :
Nat. Renewable Energy Lab., Golden, CO
fYear :
2004
fDate :
10-10 June 2004
Firstpage :
1892
Abstract :
With the publication of IEEE 1547-2003 standard for interconnecting distributed resources with electric power systems, the electric power industry has a need to develop tests and procedures for verifying that interconnection equipment meets the technical requirements. A new standard IEEE P1547.1 is being written that will give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating new test procedures that are being developed as part of IEEE P1547.1. As work progresses on the validation of the procedures, information and test reports are passed on to the working group of IEEE P1547.1 for changes to future revisions
Keywords :
IEEE standards; distributed power generation; distribution networks; electricity supply industry; power system interconnection; power system transients; synchronous generators; test equipment; IEEE 1547-2003 standard; National Renewable Energy Laboratory; dispersed generation; dispersed storage; distributed resources; electric power industry; electric power systems; interconnection equipment; interconnection testing; power system testing; power system transients; synchronous generators; Laboratories; Power generation; Power system interconnection; Power system reliability; Power systems; Renewable energy resources; Standards development; Synchronous generators; System testing; USA Councils;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1373208
Filename :
1373208