DocumentCode
2202786
Title
Commissioning experiences of the ALS booster synchrotron
Author
Kim, Charles H.
Author_Institution
Lawrence Berkeley Lab., CA, USA
fYear
1991
fDate
6-9 May 1991
Firstpage
2691
Abstract
Installation of the ALS (Advanced Light Source) booster synchrotron proper was completed on April 30, 1991, and commissioning has just begun. A circulating beam around the booster was observed on the first day of operation, May 3, 1991. The beam was visible for about 400 turns. The status and commissioning experience of the 1.5-GeV electron synchrotron accelerator are described.<>
Keywords
electron accelerators; synchrotrons; ALS booster synchrotron; Advanced Light Source; circulating beam; commissioning; electron synchrotron accelerator; status; Apertures; Extraterrestrial measurements; Frequency; Lattices; Linear particle accelerator; Magnetic fields; Magnets; Power supplies; Structural beams; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.165073
Filename
165073
Link To Document