DocumentCode
2202846
Title
The Design of Jiangxi Waterway Toll Levy System
Author
Li Ke ; Fan Nian ; Wu Junjie
Author_Institution
Sch. of Manage., Wuhan Univ. of Technol., Wuhan, China
fYear
2010
fDate
24-26 Aug. 2010
Firstpage
1
Lastpage
5
Abstract
On the basis of analyzing the present situation and existing problems of Jiangxi waterway toll levy, and making the requirements analysis of Jiangxi waterway toll levy system, this paper proposes the solutions to Fixed Levy Subsystem, Mobile Levy Subsystem, data synchronization mechanism between Fixed Levy Subsystem and Mobile Levy Subsystems based on B/S mode, including the functional structure and data access method of Fixed Levy Subsystem, the functional structure of Mobile Levy Subsystems and the program of Centralized and Distributed Mobile Levy Subsystem Based On CF GPRS Wireless Network Card, and conducts the program selection. The system will achieve comprehensively computerized bills cutting of waterway toll levy, enhance the level of management standardization, and provide the basis for the auxiliary decision-making.
Keywords
automated highways; data handling; financial data processing; synchronisation; B/S mode; CF GPRS wireless network card; Jiangxi waterway toll levy system; data access method; data synchronization mechanism; fixed levy subsystem; management standardization level; mobile levy subsystem; Business; Databases; Maintenance engineering; Mobile communication; Mobile computing; Servers; Synchronization;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5325-2
Electronic_ISBN
978-1-4244-5326-9
Type
conf
DOI
10.1109/ICMSS.2010.5578404
Filename
5578404
Link To Document