• DocumentCode
    2202945
  • Title

    An effective short-term scheduling model for mutiproduct batch plants with parallel lines

  • Author

    Changling, Chen ; Changling, Liu ; Decheng, Yuan ; Huihe, Shao

  • Author_Institution
    Inst. of Autom., Shanghai Jiao Tong Univ., China
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    1971
  • Abstract
    The paper presents a novel MILP model for batch plants with parallel lines based on the continuous time domain representation and the notation of time slot. When the model is built, the allocation of batches of products and units to time slots is formulated as two sets of binary variables respectively. This model has less binary variables than any other model based on the idea of time slot, and can accommodate sequence-dependent setup times. The computational examples show that the optimal scheduling can be obtained by solving the MILP model in a reasonably short time, especially when the scheduling problem involving a product with several batches is considered
  • Keywords
    batch processing (industrial); integer programming; production control; resource allocation; scheduling; MILP model; binary variables; continuous time domain representation; makespan; mixed integer programming; multiproduct batch plants; optimal scheduling; parallel lines; product batch allocation; scheduling problem; sequence-dependent setup times; short-term scheduling; short-term scheduling model; time slot; Electronic mail; Linear programming; Mathematical model; Mathematics; Optimal scheduling; Processor scheduling; Usability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 2001. Proceedings of the 40th IEEE Conference on
  • Conference_Location
    Orlando, FL
  • Print_ISBN
    0-7803-7061-9
  • Type

    conf

  • DOI
    10.1109/.2001.981196
  • Filename
    981196