DocumentCode
2202945
Title
An effective short-term scheduling model for mutiproduct batch plants with parallel lines
Author
Changling, Chen ; Changling, Liu ; Decheng, Yuan ; Huihe, Shao
Author_Institution
Inst. of Autom., Shanghai Jiao Tong Univ., China
Volume
2
fYear
2001
fDate
2001
Firstpage
1971
Abstract
The paper presents a novel MILP model for batch plants with parallel lines based on the continuous time domain representation and the notation of time slot. When the model is built, the allocation of batches of products and units to time slots is formulated as two sets of binary variables respectively. This model has less binary variables than any other model based on the idea of time slot, and can accommodate sequence-dependent setup times. The computational examples show that the optimal scheduling can be obtained by solving the MILP model in a reasonably short time, especially when the scheduling problem involving a product with several batches is considered
Keywords
batch processing (industrial); integer programming; production control; resource allocation; scheduling; MILP model; binary variables; continuous time domain representation; makespan; mixed integer programming; multiproduct batch plants; optimal scheduling; parallel lines; product batch allocation; scheduling problem; sequence-dependent setup times; short-term scheduling; short-term scheduling model; time slot; Electronic mail; Linear programming; Mathematical model; Mathematics; Optimal scheduling; Processor scheduling; Usability;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 2001. Proceedings of the 40th IEEE Conference on
Conference_Location
Orlando, FL
Print_ISBN
0-7803-7061-9
Type
conf
DOI
10.1109/.2001.981196
Filename
981196
Link To Document