DocumentCode :
2203508
Title :
Design of beam transfer line and injection system of Pohang Light Source
Author :
Ko, In Soo ; Yoon, M.
Author_Institution :
Pohang Accel. Lab., POSTECH, South Korea
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
2700
Abstract :
The 2-GeV electron (or positron) beam provided by full energy linac is injected into the storage ring after passing about a 100-m-long beam transfer line. Since the linac is located outside and 6 m below the ring, the injecting beam is moved toward the ring in the vertical plane by a Lambertson magnet. Prior to the injection, the orbit of the stored beam is deflected toward the septum by using four bump magnets. The injection rate is 10 Hz.<>
Keywords :
beam handling equipment; beam handling techniques; electron accelerators; linear accelerators; storage rings; Lambertson magnet; Pohang Light Source; beam transfer line; bump magnets; electron; full energy linac; injection system; positron; septum; storage ring; stored beam; Acceleration; Electron accelerators; Electron beams; Laboratories; Lattices; Light sources; Linear particle accelerator; Particle beams; Positrons; Storage rings;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.165076
Filename :
165076
Link To Document :
بازگشت