• DocumentCode
    2209717
  • Title

    A heuristic for QoS based independent task scheduling in Grid environment

  • Author

    Chauhan, Sameer Singh ; Joshi, R.C.

  • Author_Institution
    Dept. of Electron. & Comput. Eng., Indian Inst. of Technol. Roorkee, Roorkee, India
  • fYear
    2010
  • fDate
    July 29 2010-Aug. 1 2010
  • Firstpage
    102
  • Lastpage
    106
  • Abstract
    Task scheduling in Grid becomes more complicated when user demands different QoS. In this paper, we have proposed QoS Guided Weighted Mean Time Min-Min Max-Min Selective heuristic for QoS based task scheduling. The heuristic takes single QoS parameter as requirements of tasks for deciding the match between resources and tasks. The heuristic also considers the performance of resources for scheduling. We have evaluated the heuristic in GridSim, for different task scenarios. The results are obtained and compared with other heuristics like Min-Min, Max-Min, QoS Guided Min-Min, Weighted Mean Time Min-Min Max-Min Selective. The results of the proposed heuristic are better for makespan, resource utilization and resource load balancing than other above mentioned heuristics.
  • Keywords
    grid computing; quality of service; resource allocation; scheduling; QoS based independent task scheduling; QoS parameter; grid environment; gridsim heuristic; weighted mean time min-min max-min selective heuristic; Conferences; Job shop scheduling; Load management; Processor scheduling; Quality of service; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial and Information Systems (ICIIS), 2010 International Conference on
  • Conference_Location
    Mangalore
  • Print_ISBN
    978-1-4244-6651-1
  • Type

    conf

  • DOI
    10.1109/ICIINFS.2010.5578725
  • Filename
    5578725