DocumentCode :
2210473
Title :
The proposal of the accelerator complex of the Moscow kaon factory
Author :
Balandin, V.V. ; Chursin, A.G. ; Dubinsky, G.A. ; Esin, S.K. ; Golubeva, N.I. ; Iliev, A.I. ; Kravchuk, L.V. ; Matveev, V.A. ; Paramonov, V.V. ; Pashenkov, A.S. ; Senichev, Yu.V. ; Shaposhnikova, E.N. ; Volin, S.P. ; Belov, V.P. ; Glukhikh, V.A. ; Malitsk
Author_Institution :
Inst. for Nucl. Res., Acad. of Sci., Moscow, USSR
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
2823
Abstract :
The tuning of the linear accelerator of the Moscow meson factory is about to be completed. The kaon factory is the next step after the Meson factory. In the proposal for the Moscow kaon factory the linear accelerator of the meson factory is to be used as the injection for the booster. The main ring is filled during the 40-ms flat bottom magnetic field. The main ring accelerates 9.3*10/sup 13/ protons per pulse from 7.5 GeV to 45 GeV during a period. The reset of the field in the main ring takes 30 ms, and thus one cycle is 120 ms long, for a repetition rate of 8.3 Hz. The extender is needed for slow extraction with 100% duty cycle.<>
Keywords :
beam handling techniques; linear accelerators; storage rings; Moscow kaon factory; Moscow meson factory; accelerator complex; booster; extender; flat bottom magnetic field; injection; linear accelerator; main ring; repetition rate; reset; slow extraction; tuning; Acceleration; Linear accelerators; Linear particle accelerator; Magnetic fields; Mesons; Power supplies; Production facilities; Proposals; Proton accelerators; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.165115
Filename :
165115
Link To Document :
بازگشت