DocumentCode
22180
Title
Colorado river hydropower faces a dry future [News]
Author
Tweed, Katherine
Volume
50
Issue
10
fYear
2013
fDate
Oct-13
Firstpage
14
Lastpage
15
Abstract
Last year, the Hoover Dam hydroelectric plant installed the first of five wide-head turbines. These are designed to work efficiently even as the Colorado River shrinks under a record-long drought.
fLanguage
English
Journal_Title
Spectrum, IEEE
Publisher
ieee
ISSN
0018-9235
Type
jour
DOI
10.1109/MSPEC.2013.6607000
Filename
6607000
Link To Document