• DocumentCode
    22180
  • Title

    Colorado river hydropower faces a dry future [News]

  • Author

    Tweed, Katherine

  • Volume
    50
  • Issue
    10
  • fYear
    2013
  • fDate
    Oct-13
  • Firstpage
    14
  • Lastpage
    15
  • Abstract
    Last year, the Hoover Dam hydroelectric plant installed the first of five wide-head turbines. These are designed to work efficiently even as the Colorado River shrinks under a record-long drought.
  • fLanguage
    English
  • Journal_Title
    Spectrum, IEEE
  • Publisher
    ieee
  • ISSN
    0018-9235
  • Type

    jour

  • DOI
    10.1109/MSPEC.2013.6607000
  • Filename
    6607000