Title :
Valuation of planning criteria in a competitive market
Author :
Sorg, A. ; Wellssow, W.H.
Author_Institution :
Forschungsgerneinschaft fur Elektrische Analagen- und Stromwirtschaft e.V., Mannheim, Germany
Abstract :
The paper presents an investigation of manageability, expressional force, and conciseness of planning criteria for electrical power systems. Criteria are classified according to contingency- and customer-focused and in deterministic and probabilistic criteria. A short description is given. A number of actual German power systems with voltage levels from Un=20 kV up to Un=380 kV are investigated. Several variations of the criteria with respect to the network component types and remedial measures have been analyzed and compared. Additionally, the investigated probabilistic indices are compared by applying a significance test method. The results show that the international, widely used (n-1)-criterion is sometimes less restrictive than the investigated contingency-focused, probabilistic criteria
Keywords :
electricity supply industry; power system planning; probability; 20 to 380 kV; German power systems; competitive market; contingency-focused probabilistic criteria; deterministic criteria; electrical power systems; n-1-criterion; planning criteria; probabilistic criteria; probabilistic indices; remedial measures; significance test method; Cost accounting; Energy management; Power system analysis computing; Power system management; Power system measurements; Power system modeling; Power system planning; Power system reliability; Testing; Voltage;
Conference_Titel :
Electric Utility Deregulation and Restructuring and Power Technologies, 2000. Proceedings. DRPT 2000. International Conference on
Conference_Location :
London
Print_ISBN :
0-7803-5902-X
DOI :
10.1109/DRPT.2000.855651