DocumentCode
2221856
Title
Scatter search for multi-mode resource-constrained project scheduling problems
Author
Pourghaderi, A.R. ; Torabi, S.A. ; Talebi, J.
Author_Institution
Dept. of Ind. Eng., Univ. of Tehran, Tehran, Iran
fYear
2008
fDate
8-11 Dec. 2008
Firstpage
163
Lastpage
167
Abstract
In this paper the multi-mode resource-constrained project scheduling problem is considered. Activities are non-preemptable, resources are renewable, and the objective is to minimize the project duration (or makespan). A local search metaheuristic-scatter search is proposed to solve this strongly NP-hard problem. A comprehensive computational experiment is described, performed on a set of instances based on standard test problems constructed by the proGen project generator. The performance of this scatter search algorithm is compared with the performance of other published algorithms for multi-mode resource-constrained project scheduling problem, the results are analyzed and discussed and some conclusions are given.
Keywords
minimisation; resource allocation; scheduling; search problems; NP-hard problem; local search metaheuristic; makespan minimization; multimode resource-constrained project scheduling problem; scatter search; Availability; Educational institutions; Industrial engineering; Job shop scheduling; NP-hard problem; Performance evaluation; Processor scheduling; Scattering; Scheduling algorithm; Simulated annealing; Makespan; Multi-mode resource-constrained project scheduling problem; Scatter search;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-2629-4
Electronic_ISBN
978-1-4244-2630-0
Type
conf
DOI
10.1109/IEEM.2008.4737852
Filename
4737852
Link To Document