• DocumentCode
    2221856
  • Title

    Scatter search for multi-mode resource-constrained project scheduling problems

  • Author

    Pourghaderi, A.R. ; Torabi, S.A. ; Talebi, J.

  • Author_Institution
    Dept. of Ind. Eng., Univ. of Tehran, Tehran, Iran
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    163
  • Lastpage
    167
  • Abstract
    In this paper the multi-mode resource-constrained project scheduling problem is considered. Activities are non-preemptable, resources are renewable, and the objective is to minimize the project duration (or makespan). A local search metaheuristic-scatter search is proposed to solve this strongly NP-hard problem. A comprehensive computational experiment is described, performed on a set of instances based on standard test problems constructed by the proGen project generator. The performance of this scatter search algorithm is compared with the performance of other published algorithms for multi-mode resource-constrained project scheduling problem, the results are analyzed and discussed and some conclusions are given.
  • Keywords
    minimisation; resource allocation; scheduling; search problems; NP-hard problem; local search metaheuristic; makespan minimization; multimode resource-constrained project scheduling problem; scatter search; Availability; Educational institutions; Industrial engineering; Job shop scheduling; NP-hard problem; Performance evaluation; Processor scheduling; Scattering; Scheduling algorithm; Simulated annealing; Makespan; Multi-mode resource-constrained project scheduling problem; Scatter search;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4737852
  • Filename
    4737852