• DocumentCode
    2222933
  • Title

    Human resource planning with worker attendance uncertainty

  • Author

    Ng, T.S. ; Huang, H.C. ; Ng, J.Y.

  • Author_Institution
    Dept. of Ind. & Syst. Eng., Nat. Univ. of Singapore, Singapore, Singapore
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    364
  • Lastpage
    368
  • Abstract
    We consider a human resource supply planning problem given a set of job demands. The staffing levels of different workforce types to fulfill the jobs need to be determined, a priori to full knowledge of the attendance rates of the workers. The objective is to find the optimal staffing levels that minimize the hiring costs while maintaining a high certainty of fulfilling all the jobs. We propose six different approaches for generating solutions to the problem. Computational experiments are conducted to evaluate the performance of the approaches. Our experimental results show that two approaches: one based on stochastic programming and the other based on robust optimization using an ellipsoid uncertainty set, outperforms the other approaches consistently in various performance measures.
  • Keywords
    human resource management; optimisation; personnel; planning; uncertain systems; hiring cost minimisation; human resource supply planning problem; optimal staffing level; worker attendance uncertainty; Cost function; Ellipsoids; Functional programming; Humans; Process planning; Robustness; Safety; Stochastic processes; Systems engineering and theory; Uncertainty; Workforce supply; absenteeism; ellipsoid uncertainty set; stochastic programming;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4737892
  • Filename
    4737892