• DocumentCode
    2223752
  • Title

    Availability analysis of Rubber Preparation System a subsystem of a tube manufacturing plant under preemptive resume priority repair

  • Author

    Gupta, P. ; Jayant, A. ; Goyal, A.

  • Author_Institution
    Dept. of Mech. Eng., Sant Longowal Inst. of Eng. & Technol., Sangrur, India
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    506
  • Lastpage
    511
  • Abstract
    An availability model of the gradually deteriorating Rubber Preparation System, a part of a cycle rubber tube manufacturing plant is presented in this paper for improving its availability. The methodology for determining the availability of the system under preemptive resume priority repair discipline is based on Markov Modeling. The system undergoes for preventive maintenance (PM) and corrective maintenance (CM) on its transition to degraded and failed states respectively. The effect of repair error in preventive maintenance on most vulnerable items of the system is examined to realize the highest level of performance. The failure and repair rates of the different subcomponents of the system are taken as constant. Probability considerations at various stages of the system give differential equations which are solved using Laplace Transform to obtain the state probabilities. Performance analysis of the system has been carried out which helped in identifying the critical factors and assessing their impact on the system availability.
  • Keywords
    Laplace transforms; Markov processes; differential equations; preventive maintenance; probability; rubber; rubber industry; Laplace transform; Markov modeling; availability analysis; availability model; corrective maintenance; cycle rubber tube manufacturing plant; differential equations; preemptive resume priority repair; preventive maintenance; probability; repair error; rubber preparation system; state probabilities; Availability; Degradation; Differential equations; Laplace equations; Performance analysis; Preventive maintenance; Pulp manufacturing; Resumes; Rubber; Virtual manufacturing; Preventive maintenance; availability; priority; productivity; reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4737920
  • Filename
    4737920