DocumentCode :
2225695
Title :
A New Scheduling Method for ELMC Based on VxWorks
Author :
Tang Shuyuan ; Xiang Zheng ; Yuan Feng
Author_Institution :
Sch. of Telecommun. Eng., Xidian Univ., Xi´an, China
fYear :
2009
fDate :
26-28 Dec. 2009
Firstpage :
47
Lastpage :
50
Abstract :
The development of software for Electric Load Management Center (ELMC) is presented in this paper. Based on the embedded real-time operating system VxWorks, ELMC performs multiple tasks including periodic and aperiodic ones. While rate monotonic (RM) algorithm is still used to process periodic tasks, we propose a condition triggered algorithm (CTA) to schedule aperiodic tasks by using VxWorks´s semaphore mechanism. The schedulability test is also presented in this paper. We improved the test conditions to meet the needs of this system. At last, several tests are held and the results proved that compared with other scheduling procedures, the hybrid scheduling scheme has greatly improved the real-time capability and shortened response time for urgent tasks.
Keywords :
aircraft; distribution networks; embedded systems; load management; multiprogramming; power engineering computing; scheduling; software engineering; CTA; ELMC; ELMC scheduling method; VxWorks; condition triggered algorithm; electric load management center; embedded real-time operating system; software development; Centralized control; Control systems; Load management; Operating systems; Power system simulation; Process control; Processor scheduling; Real time systems; Scheduling algorithm; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2009 1st International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-4909-5
Type :
conf
DOI :
10.1109/ICISE.2009.103
Filename :
5455243
Link To Document :
بازگشت