DocumentCode
2225695
Title
A New Scheduling Method for ELMC Based on VxWorks
Author
Tang Shuyuan ; Xiang Zheng ; Yuan Feng
Author_Institution
Sch. of Telecommun. Eng., Xidian Univ., Xi´an, China
fYear
2009
fDate
26-28 Dec. 2009
Firstpage
47
Lastpage
50
Abstract
The development of software for Electric Load Management Center (ELMC) is presented in this paper. Based on the embedded real-time operating system VxWorks, ELMC performs multiple tasks including periodic and aperiodic ones. While rate monotonic (RM) algorithm is still used to process periodic tasks, we propose a condition triggered algorithm (CTA) to schedule aperiodic tasks by using VxWorks´s semaphore mechanism. The schedulability test is also presented in this paper. We improved the test conditions to meet the needs of this system. At last, several tests are held and the results proved that compared with other scheduling procedures, the hybrid scheduling scheme has greatly improved the real-time capability and shortened response time for urgent tasks.
Keywords
aircraft; distribution networks; embedded systems; load management; multiprogramming; power engineering computing; scheduling; software engineering; CTA; ELMC; ELMC scheduling method; VxWorks; condition triggered algorithm; electric load management center; embedded real-time operating system; software development; Centralized control; Control systems; Load management; Operating systems; Power system simulation; Process control; Processor scheduling; Real time systems; Scheduling algorithm; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2009 1st International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-4909-5
Type
conf
DOI
10.1109/ICISE.2009.103
Filename
5455243
Link To Document