DocumentCode
2227083
Title
Cycle time reduction in assembly and test manufacturing factories: A KPI driven methodology
Author
Zheng, Li ; Xiao, Jing ; Hou, Forest ; Feng, Wei ; Li, Na
Author_Institution
Dept. of Ind. Eng., Tsinghua Univ., Beijing, China
fYear
2008
fDate
8-11 Dec. 2008
Firstpage
1234
Lastpage
1238
Abstract
In this paper we will introduce a new cycle time performance tracking matrix derived from the factory physics queuing model. We will explore a systematic way to structure the hierarchical cycle time key performance indicators (KPI) framework and also to define the right owner to improve those measurements. We will extend the discussion to some control and improvement methods, in particular, CONWIP release control management, a first in first out (FIFO) dispatching automation tool and the use of value stream mapping (VSM) to reduce factory variability. These tools and methods lead to great benefits to the factory cost saving.
Keywords
manufacturing systems; matrix algebra; queueing theory; KPI driven methodology; assembly-test manufacturing factories; cycle time performance tracking matrix; factory cost saving; factory physics queuing model; factory variability; first in first out dispatching automation tool; hierarchical cycle time key performance indicators; value stream mapping; Assembly; Automatic control; Equations; Floors; Manufacturing automation; Production facilities; Pulp manufacturing; Queueing analysis; Testing; Virtual manufacturing; Cycle time; FIFO rule; key performance matrix; value stream mappi;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-2629-4
Electronic_ISBN
978-1-4244-2630-0
Type
conf
DOI
10.1109/IEEM.2008.4738067
Filename
4738067
Link To Document