• DocumentCode
    2227083
  • Title

    Cycle time reduction in assembly and test manufacturing factories: A KPI driven methodology

  • Author

    Zheng, Li ; Xiao, Jing ; Hou, Forest ; Feng, Wei ; Li, Na

  • Author_Institution
    Dept. of Ind. Eng., Tsinghua Univ., Beijing, China
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    1234
  • Lastpage
    1238
  • Abstract
    In this paper we will introduce a new cycle time performance tracking matrix derived from the factory physics queuing model. We will explore a systematic way to structure the hierarchical cycle time key performance indicators (KPI) framework and also to define the right owner to improve those measurements. We will extend the discussion to some control and improvement methods, in particular, CONWIP release control management, a first in first out (FIFO) dispatching automation tool and the use of value stream mapping (VSM) to reduce factory variability. These tools and methods lead to great benefits to the factory cost saving.
  • Keywords
    manufacturing systems; matrix algebra; queueing theory; KPI driven methodology; assembly-test manufacturing factories; cycle time performance tracking matrix; factory cost saving; factory physics queuing model; factory variability; first in first out dispatching automation tool; hierarchical cycle time key performance indicators; value stream mapping; Assembly; Automatic control; Equations; Floors; Manufacturing automation; Production facilities; Pulp manufacturing; Queueing analysis; Testing; Virtual manufacturing; Cycle time; FIFO rule; key performance matrix; value stream mappi;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4738067
  • Filename
    4738067