Title
Cost Control Analysis of Hydroelectric Engineering Based on AHM
Author
Zhou, Yi-Hong ; Song, Ling ; Zhang, Hua ; Zhao, Biao
Author_Institution
Coll. of Water Resources & Hydroelectric Eng., Wuhan Univ., Wuhan, China
fYear
2009
fDate
26-28 Dec. 2009
Firstpage
4248
Lastpage
4251
Abstract
Generally, hydroelectric projects have long construction period, and its investment scale is very big. Simultaneously, its construction technology is difficult. Under these conditions, how to balance construction cost, schedule, and quality is always a problem concerned by constructors. In construction management, the optimum goal is minimum cost with the guarantee for schedule and quality. This paper analyzes the construction process of hydroelectric projects according to its characteristics in detail. On the basis of depth research, the cost control points were determined. After developing hydroelectric projects cost control system, the paper applies Analytic Hierarchical Model (AHM) to research a construction case, making a scheduling for its cost control points to make the direction of cost management clear in the future. The final purpose is to provide an evidence for enterprise to realize the optimum cost control.
Keywords
hydroelectric power stations; power system management; analytic hierarchical model; construction management; construction technology; cost control analysis; cost management; hydroelectric engineering; hydroelectric projects cost control system; Control systems; Cost function; Educational institutions; Financial management; Information science; Investments; Optimal scheduling; Project management; Quality management; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2009 1st International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-4909-5
Type
conf
DOI
10.1109/ICISE.2009.438
Filename
5455320
Link To Document