Title :
Monsoon risks for construction sites in India
Author :
Guha, Himadri ; Biswas, Partha Pratim
Author_Institution :
Dept. of Constr. Eng., Jadavpur Univ., Kolkata, India
Abstract :
Monsoon is a major weather phenomenon and has a substantial impact on construction activities in India. In this paper an attempt has been made in developing a frame work for objective assessment of the impacts of monsoon for building works. A study has been made for a housing project which were at various stages of constructions during the monsoon. Time and cost data were collected from the contractor. Extra time for items like foundations which are sensitive to monsoon are assessed with reference to the existing weather records. Monte Carlos simulations were conducted to assess the impacts of time and cost that could be attributed to monsoon. It has been found that the monsoon has increased the project duration by about 5% and the cost by 12%. The study indicates that specific planning for monsoon impact for each project is a worthwhile proposition in cities like Kolkata, India.
Keywords :
Monte Carlo methods; construction industry; meteorology; risk analysis; India; Kolkata; Monte Carlos simulations; building works; construction sites; housing project; monsoon risks; weather phenomenon; Buildings; Cities and towns; Concrete; Costs; Delay estimation; Floods; Rain; Raw materials; Supply chains; Wind; Monsoon impact; Monte Carlo Simulation; Schedule risk;
Conference_Titel :
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-2629-4
Electronic_ISBN :
978-1-4244-2630-0
DOI :
10.1109/IEEM.2008.4738167