DocumentCode
2230251
Title
A method of bottleneck control in build-to-order supply chain
Author
Xu, Yimin ; Ma, Shihua
Author_Institution
Sch. of Manage., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear
2008
fDate
8-11 Dec. 2008
Firstpage
1845
Lastpage
1849
Abstract
Build-to-order (BTO) supply chain is a successful pattern for satisfying end customer needs. But the present product control strategies and methods like JIT are difficult to work in BTO supply chain. In this paper, a new theoretic approach to bottleneck identification in BTO supply chain is introduced. The approach is combined with the theory of constraints and input/output control. Using this approach, bottlenecks are defined, and their implications for production control are discussed. Then a production control model based on the bottlenecks is developed and analyzed. At last, a queuing model to describe the model is made.
Keywords
customer satisfaction; production control; queueing theory; supply chain management; bottleneck control; bottleneck identification; build-to-order supply chain; end customer needs satisfaction; production control model; queuing model; Control systems; Costs; Environmental economics; Manufacturing; Materials requirements planning; Production control; Production systems; Supply chain management; Supply chains; Technology management; BTO supply chain; production control; supply bottleneck;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-2629-4
Electronic_ISBN
978-1-4244-2630-0
Type
conf
DOI
10.1109/IEEM.2008.4738191
Filename
4738191
Link To Document