• DocumentCode
    2230251
  • Title

    A method of bottleneck control in build-to-order supply chain

  • Author

    Xu, Yimin ; Ma, Shihua

  • Author_Institution
    Sch. of Manage., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    1845
  • Lastpage
    1849
  • Abstract
    Build-to-order (BTO) supply chain is a successful pattern for satisfying end customer needs. But the present product control strategies and methods like JIT are difficult to work in BTO supply chain. In this paper, a new theoretic approach to bottleneck identification in BTO supply chain is introduced. The approach is combined with the theory of constraints and input/output control. Using this approach, bottlenecks are defined, and their implications for production control are discussed. Then a production control model based on the bottlenecks is developed and analyzed. At last, a queuing model to describe the model is made.
  • Keywords
    customer satisfaction; production control; queueing theory; supply chain management; bottleneck control; bottleneck identification; build-to-order supply chain; end customer needs satisfaction; production control model; queuing model; Control systems; Costs; Environmental economics; Manufacturing; Materials requirements planning; Production control; Production systems; Supply chain management; Supply chains; Technology management; BTO supply chain; production control; supply bottleneck;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4738191
  • Filename
    4738191