DocumentCode
2231005
Title
Management of working shifts using the constraint programming paradigm
Author
de la Fuente, D. ; Lozano, Jesùs
Author_Institution
Sch. of Eng., Super. Polytech., Gijon, Spain
fYear
2008
fDate
8-11 Dec. 2008
Firstpage
1991
Lastpage
1995
Abstract
After an introduction to constraint programming and the man power job shifting problem, we applied the constraint programming paradigm in the development of C code to make year wide calendars for a given prerequisites. We present a diagram of the program which shows a very efficient way to solve the problem. The resulting multi-shift calendars were well balanced between shifts and were produced in short computational time.
Keywords
C language; constraint handling; human resource management; mathematical programming; scheduling; C code development; computational time; constraint programming paradigm; manpower job shifting problem; manpower scheduling; multishift calendar; working shift management; Bibliographies; Calendars; Engineering management; Mathematical model; Mathematical programming; Power engineering and energy; Processor scheduling; Sun; Testing; Constraint programming; manpower scheduling; rostering problem;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-2629-4
Electronic_ISBN
978-1-4244-2630-0
Type
conf
DOI
10.1109/IEEM.2008.4738220
Filename
4738220
Link To Document