    An analysis of a permissive overreaching transfer trip scheme at a 120kV substation

  • Author

    Louie, Russell ; Etezadi-Amoli, Mehdi

  • Author_Institution
    Dept. of Electr. Eng., Univ. of Nevada, Reno, Reno, NV, USA
  • fYear
    2008
  • fDate
    28-30 Sept. 2008
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper describes a post fault investigation into an undesired operation of a protective device in a permissive overreaching transfer tripping scheme at a 120 kV substation. The paper includes a system description, an event analysis, and a proposed solution.
  • Keywords
    fault diagnosis; substations; event analysis; permissive overreaching transfer trip scheme; post fault investigation; substation; system description; voltage 120 kV; Airports; Circuit faults; Displays; Fault currents; Laboratories; Protective relaying; Relays; Storms; Substation protection; Transmission lines; Permissive Overreaching Transfer Trip (POTT) scheme; Protective relayingTransmission lines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Symposium, 2008. NAPS '08. 40th North American
  • Conference_Location
    Calgary, AB
  • Print_ISBN
    978-1-4244-4283-6
  • Type

    conf

  • DOI
    10.1109/NAPS.2008.5307398
  • Filename
    5307398