DocumentCode
2231387
Title
From Drawing Board to Market Place in Two Years: Introduction of an Advanced BiCMOS Product through the use of Cross Functional Teams
Author
Hanley, Susan E. ; Wilson, Douglas
Author_Institution
National Semiconductor, South Portland, ME
fYear
1993
fDate
18-19 Oct 1993
Firstpage
13
Lastpage
17
Keywords
BiCMOS integrated circuits; Delay; Job shop scheduling; Manufacturing processes; Problem-solving; Product design; Product development; Reliability engineering; Resists; Semiconductor device manufacture;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Semiconductor Manufacturing Conference and Workshop, 1993. ASMC 93 Proceedings. IEEE/SEMI
Type
conf
DOI
10.1109/ASMC.1993.682471
Filename
682471
Link To Document