• DocumentCode
    2231884
  • Title

    Application of earned value analysis in project monitoring and control of CMMI

  • Author

    Kedi, Zhu ; Hongping, Yang

  • Author_Institution
    Inf. Eng. Dept., Shenyang Inst. of Eng., Shenyang, China
  • Volume
    4
  • fYear
    2010
  • fDate
    20-22 Aug. 2010
  • Abstract
    The earned value analysis is a recommended practical and effective method of the project monitoring and process areas controlling in CMMI software project Maturity Model. The Earned Value Analysis method was analysis in this paper. Work breakdown structure(WBS), Earned value mapping, Progress and Analysis of Cost difference and how to forecast trends in the project are analysis with real examples, and the experience of some of the data and description are given.
  • Keywords
    project management; software management; statistical analysis; CMMI; cost difference analysis; earned value analysis; earned value mapping; project control; project monitoring; software project maturity model; work breakdown structure; Lead; Schedules; CMMI; Earned Value Analysis; Project Monitoring and Control; WBS;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Computer Theory and Engineering (ICACTE), 2010 3rd International Conference on
  • Conference_Location
    Chengdu
  • ISSN
    2154-7491
  • Print_ISBN
    978-1-4244-6539-2
  • Type

    conf

  • DOI
    10.1109/ICACTE.2010.5579692
  • Filename
    5579692