DocumentCode
2234935
Title
Research on the Optimization of Working Group Configuration in a Power Dispatching System
Author
Yang, Yang ; Yang, Lei ; Zhang, Xiaopeng
Author_Institution
Eng. Sch., Hong Kong Univ. of Sci. & Technol., Hong Kong, China
fYear
2009
fDate
26-28 Dec. 2009
Firstpage
3843
Lastpage
3846
Abstract
Dispatching speeds of certain substations exert a great impact on the power supply of both residents and industries and the security of power grid. Choosing substations in Guangdong Power Grid as the research object, this paper researches on the operating process of dispatching instructions with Monte Carlo method. By comparing the statistical indicators, such as the probability of waiting, the average time of instruction dispatch, the utilization of working group, etc, of single-working-group and double-working-group systems, this paper proposes valid decision making methods for optimal configuration of operators in substations.
Keywords
Monte Carlo methods; decision making; load dispatching; power grids; power system security; substations; Monte Carlo method; decision making methods; instruction dispatch; power dispatching system; power grid security; substations; working group configuration; Analytical models; Decision making; Dispatching; Electricity supply industry; Frequency; Power engineering and energy; Power grids; Power system reliability; Power system security; Substations;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2009 1st International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-4909-5
Type
conf
DOI
10.1109/ICISE.2009.1010
Filename
5455623
Link To Document