DocumentCode :
2243547
Title :
Scheduling preempt-repeat version jobs on a machine subject to stochastic breakdowns to minimize quadratic earliness-tardiness penalties (i)
Author :
Cheng, Congdian
Author_Institution :
Coll. of Math. & Syst. Sci., Shenyang Normal Univ., Shenyang, China
Volume :
2
fYear :
2010
fDate :
6-7 March 2010
Firstpage :
389
Lastpage :
392
Abstract :
This article addresses the problem of scheduling n preempt-repeat version jobs with a common due date on a machine subject to stochastic breakdowns to minimize quadratic earliness-tardiness penalties. I proceed to study under the condition of the uptimes following an exponential distribution and with the method of large analysis of random variables. My main contributions are as follows. (1) An analytic expression for the second moment of the completion time about a preempt-repeat version job processed on a machine subject to stochastic breakdowns is proposed. (2) The result that the optimal solutions are V-shaped is proposed and proven.
Keywords :
job shop scheduling; stochastic processes; exponential distribution; machine scheduling; preempt-repeat version job scheduling; quadratic earliness-tardiness penalties minimization; stochastic breakdowns; Asia; Automatic control; Electric breakdown; Exponential distribution; Informatics; Random variables; Robot control; Robotics and automation; Stochastic processes; Stochastic systems; V-shape; common due date; quadratic earliness-tardiness penalties; scheduling; stochastic breakdowns;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Informatics in Control, Automation and Robotics (CAR), 2010 2nd International Asia Conference on
Conference_Location :
Wuhan
ISSN :
1948-3414
Print_ISBN :
978-1-4244-5192-0
Electronic_ISBN :
1948-3414
Type :
conf
DOI :
10.1109/CAR.2010.5456519
Filename :
5456519
Link To Document :
بازگشت