Title :
V&V in defense and commercial projects
Author :
Hecht, Herbert ; Hecht, Myron
Author_Institution :
SoHaR Inc., Beverly Hills, CA, USA
Abstract :
Verification and validation activities in defense projects are compared with those in the nuclear power plant industry. A significant difference is that in most defense projects the V&V effort is funded directly by the sponsor whereas in the nuclear power industry the major responsibility for V&V resides with the developer. This may cause a shift in V&V emphasis from early life cycle stages (in defense) to later phases (in the nuclear power industry). The paper shows that there are sufficient similarities to make development of dual use technologies possible
Keywords :
military computing; nuclear engineering computing; nuclear power stations; power engineering computing; program verification; software reliability; software reusability; V&V; commercial projects; defense projects; dual use technologies; life cycle stages; nuclear power industry; nuclear power plant industry; reused software; software reliability; verification and validation activities; Aerospace control; Aircraft; Defense industry; Paper technology; Power generation; Power industry; Power system modeling; Programming; Software safety; Software testing; System testing;
Conference_Titel :
Software Reliability Engineering, 1994. Proceedings., 5th International Symposium on
Conference_Location :
Monterey, CA
Print_ISBN :
0-8186-6665-X
DOI :
10.1109/ISSRE.1994.341357