DocumentCode :
2244616
Title :
33kV automatic fault isolation and supply restoration
Author :
Shephard, B. ; Barker, J.
fYear :
2002
fDate :
17-19 April 2002
Firstpage :
204
Lastpage :
209
Abstract :
This paper follows a project to enhance the quality of supply delivered by a 33 kV overhead line network in the south-east of England. In this instance, a network automation approach was selected-once the technical challenges could be overcome, this solution offered a highly cost-effective means of improving network performance. When a fault occurs, the scheme rapidly localises and disconnects the faulted section of network and automatically restores supplies to customers.
Keywords :
power overhead lines; power supply quality; power system control; power system faults; power system restoration; 33 kV; automatic fault isolation; automatic supply restoration; network performance improvement; overhead line network; power quality enhancement; technical challenges;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Power System Management and Control, 2002. Fifth International Conference on (Conf. Publ. No. 488)
ISSN :
0537-9989
Print_ISBN :
0-85296-748-9
Type :
conf
DOI :
10.1049/cp:20020035
Filename :
1032170
Link To Document :
بازگشت