DocumentCode
2249681
Title
Comparison of correlation algorithms between GTEM cell and semi anechoic chamber
Author
Kwon, Jonghwa ; Park, Hyun Ho ; Lee, Ae-Kyoung ; Choi, Hyung-Do
Author_Institution
Radio Tech. Dept., Electron. & Telecommun. Res. Inst., Taejon, South Korea
Volume
1
fYear
2002
fDate
19-23 Aug. 2002
Firstpage
481
Abstract
The main purpose of GTEM cell as an alternative facility for EMC compliance testing is to accurately measure the radiated emission generated from an equipment-under-test (EUT). The open area test site (OATS) is the standard test facility for radiated emission measurements, thus the GTEM cell data have to be correlated to the OATS results. The correlation algorithms between GTEM cell and OATS such as 3, 6/9 and 15 position methods, etc., simulate the EM test for an EUT over the ground plane by using the power radiated from EUT located within the GTEM cell. This paper statistically verifies two well-known correlation algorithms, that is, 3 and 15 position algorithms by comparing the data obtained by the correlation algorithms at GTEM cell with the results measured with antenna at semi-anechoic chamber (SAC). Also, the results obtained by those correlation algorithms are compared with the theoretical values calculated from an ideal dipole model to minimize the effects due to any measurement uncertainty. From the results, it was found that the data obtained by the GTEM cell and those correlation algorithms have a strong correlation with the data at SAC. In addition, the EM data obtained by 3 and 6/9 position methods showed higher than those by the others at almost all frequencies.
Keywords
TEM cells; anechoic chambers (electromagnetic); electromagnetic compatibility; electromagnetic interference; immunity testing; open area test sites; 15 position method; 3 position method; 6/9 position method; EM data; EM test; EMC compliance testing; EUT; GTEM cell; antenna; correlation algorithms; equipment-under-test; ground plane; ideal dipole model; measurement uncertainty; open area test site; radiated emission; radiated emission measurements; semi anechoic chamber; standard test facility; Anechoic chambers; Antenna measurements; Area measurement; Electromagnetic compatibility; Measurement standards; Open area test sites; Position measurement; TEM cells; Test facilities; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electromagnetic Compatibility, 2002. EMC 2002. IEEE International Symposium on
Conference_Location
Minneapolis, MN, USA
Print_ISBN
0-7803-7264-6
Type
conf
DOI
10.1109/ISEMC.2002.1032526
Filename
1032526
Link To Document