Title :
Advanced design and construction considerations of EMC test facilities
Author_Institution :
Cisco Syst. Inc., San Jose, CA, USA
Abstract :
There are numerous design details requiring careful planning in order to maximize the effectiveness and minimize the cost of a modern EMC lab. In addition, the construction fit-up costs can easily equal or exceed the cost of the chambers. In order to optimize the investment, appropriate consideration should be given to facility design and construction techniques. This paper discusses EMC facility design, chamber design and construction issues. Additionally, the areas of cost savings, various designs and feature pros and cons, and several pitfalls that can be avoided are reviewed.
Keywords :
electromagnetic compatibility; laboratories; test facilities; EMC facility design; EMC laboratory; EMC test facilities; chamber design; cost savings; facility construction techniques; facility design; investment optimisation; project scheduling; vendor selection; Buildings; Costs; Design optimization; Electromagnetic compatibility; Investments; Job shop scheduling; Modems; Project management; Radio frequency; Test facilities;
Conference_Titel :
Electromagnetic Compatibility, 2002. EMC 2002. IEEE International Symposium on
Conference_Location :
Minneapolis, MN, USA
Print_ISBN :
0-7803-7264-6
DOI :
10.1109/ISEMC.2002.1032537