• DocumentCode
    2252361
  • Title

    Single machine scheduling with exponential processing times and a general form objective function

  • Author

    Jia, Chunfu

  • Author_Institution
    Coll. of Inf. Technol. & Sci., Nankai Univ., Tianjin, China
  • Volume
    6
  • fYear
    2003
  • fDate
    4-6 June 2003
  • Firstpage
    4949
  • Abstract
    A single machine scheduling with exponential processing times is considered, the objective is to minimize an objective function which is a general form of several regular (the objective function is increasing with respect to job completion times) and non-regular objective functions, such as, the expected flow time, the expected total tardiness about a deterministic common due date and the expected derivations of completion time about a deterministic common due date, etc. The characters of the optimal schedulers, such as V-shaped and Λ-shaped characters, are derived.
  • Keywords
    exponential distribution; operations research; single machine scheduling; Λ-shaped character; LEPT schedule; SEPT schedule; V-shaped character; completion derivation; exponential processing time; flow time; job completion time; nonregular objective function; optimal scheduler; single machine scheduling; total tardiness; Distribution functions; Educational institutions; Electric breakdown; Information technology; Optimal scheduling; Random variables; Single machine scheduling; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, 2003. Proceedings of the 2003
  • ISSN
    0743-1619
  • Print_ISBN
    0-7803-7896-2
  • Type

    conf

  • DOI
    10.1109/ACC.2003.1242507
  • Filename
    1242507