Abstract
This paper analyzes a single-period auction-based algorithm used to clear a pool-based electric energy market. This analysis is made in terms of economic efficiency of the solutions attained, and in terms of cross-subsidies among generators and demands. A single-period auction-based algorithm neglects inter-temporal constraints of the generators and network constraints, so additional algorithms are needed to take these conditions into account provoking inefficiencies and cross-subsidies. This paper clearly shows the cost of using an overly simple procedure such as a single-period auction-based algorithm and proposes a more efficient procedure, a multi-period market clearing algorithm, that takes properly into account technical constraints of generators and network constraints
Keywords
game theory; power markets; cross-subsidies; economic efficiency; generators; inefficiencies; multiperiod market clearing algorithm; network constraints; pool-based electric energy markets; single-period auction-based algorithm; technical constraints; Algorithm design and analysis; Costs; Dispatching; Power engineering and energy; Power generation economics; Production; Propagation losses; Supply and demand; Time factors; Transmission line measurements;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrotechnical Conference, 2006. MELECON 2006. IEEE Mediterranean
Conference_Location
Malaga
Print_ISBN
1-4244-0087-2
Type
conf
DOI
10.1109/MELCON.2006.1653250
Filename
1653250
Link To Document