DocumentCode
2259124
Title
A flexible control mechanism for managing interrelated/interdependent tasks successively
Author
Watanabe, Hiroyuki ; Watanabe, Toyohide ; Sugie, Noboru
Author_Institution
Dept. of Inf. Eng., Nagoya Univ., Japan
fYear
1994
fDate
9-11 Nov 1994
Firstpage
78
Lastpage
83
Abstract
We propose a framework to manage interrelated tasks concurrently and successively, and address the issues of event handling and task scheduling: the event handler organizes interrelated tasks from a static point of view, and the task scheduler controls them on the basis of the dynamic behavior properties. In order to design our flexible control mechanism, we introduce the state transition graph and AND-OR graph in the event handler, whereas in the task scheduler the timestamp ordering method is applied to. Additionally, we describe the failure handling, concerning the cooperation between the event handler and task scheduler
Keywords
concurrency control; graph theory; scheduling; task analysis; AND-OR graph; dynamic behavior properties; event handler; event handling; failure handling; flexible control mechanism; interdependent task management; interrelated task management; state transition graph; task scheduler; task scheduling; timestamp ordering method; Autonomous agents; Database systems; Engineering management; Humans; Marine vehicles; Problem-solving; Scheduling; Throughput;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Software and Applications Conference, 1994. COMPSAC 94. Proceedings., Eighteenth Annual International
Conference_Location
Taipei
Print_ISBN
0-8186-6705-2
Type
conf
DOI
10.1109/CMPSAC.1994.342828
Filename
342828
Link To Document