DocumentCode :
2265894
Title :
Equipment buffering strategy to maximize productivity
Author :
Subramaniam, B. ; Pillai, D.
fYear :
2003
fDate :
30 Sept.-2 Oct. 2003
Firstpage :
329
Lastpage :
332
Abstract :
In the infancy of 300mm, I300I and J300 adopted a cost-effective 1+1 loadport buffering for most tools with a few exceptions (litho link, implant) where the run-rate and expected utilization of the tool motivated a larger buffer. Metrology tools, inspite of their very high run-rates, were to follow the standard 1+1 configuration due to the cost and footprint impact of additional loadports relative to the expected average utilization. 300mm production experience has shown the need for burst capacity on these tools. This paper explores ways to improve productivity of these tools without compromising cost or footprint goals.
Keywords :
costing; integrated circuit manufacture; optimised production technology; production equipment; production planning; productivity; 300 mm; cost effectiveness; loadport buffering; metrology tools; production experience; production improvement; productivity; Costs; Guidelines; Implants; Inventory management; Manufacturing processes; Production; Productivity; Proposals; Robotics and automation; Service robots;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 2003 IEEE International Symposium on
ISSN :
1523-553X
Print_ISBN :
0-7803-7894-6
Type :
conf
DOI :
10.1109/ISSM.2003.1243294
Filename :
1243294
Link To Document :
بازگشت