DocumentCode :
2271442
Title :
A strategy of membrane cleaning and replacement schedule for spiral-wound SWRO system
Author :
Aipeng, Jiang ; Wen, Cheng ; Shu, Jiangzhou ; Yinghui, Lin
Author_Institution :
Hangzhou Dianzi University, Hangzhou 310018, Zhejiang, China
fYear :
2015
fDate :
28-30 July 2015
Firstpage :
8750
Lastpage :
8755
Abstract :
Membrane fouling is the chief culprit of the degradation of membrane performance. To reduce the operation cost, a new membrane cleaning and replacing strategy is addressed here. After establishing the SWRO performance model according to the fouling process mechanism, an optimization problem is founded with minimizing the daily operation cost as target, membrane cleaning and replacing time and frequency as optimizing variables, open equations as constraints. And then, the complicated optimization is solved by simultaneous method quickly and easily. Based on these techniques, case study on SWRO system is carried out and the solutions indicates that: 1). The proposed optimization strategy has a great potential to reduce the operation cost while obtaining the optimal membrane cleaning and replacing time and membrane cleaning frequency; 2). Feed water temperature has a significant impact on the optimal cleaning and replacing strategy. And the composition of the optimal cost and the curves of the optimal operation pressure and flow rate, which is of great significance to the further study of the system operation and analysis.
Keywords :
Cleaning; Desalination; Feeds; Finite element analysis; Mathematical model; Optimization; Time-frequency analysis; RO; cleaning and replacement; desalination; membranes; optimization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference (CCC), 2015 34th Chinese
Conference_Location :
Hangzhou, China
Type :
conf
DOI :
10.1109/ChiCC.2015.7261021
Filename :
7261021
Link To Document :
بازگشت