Title :
Meta-heuristic approaches for solving Resource Constrained Project Scheduling Problem: A Comparative study
Author :
Das, Partha Pratim ; Acharyya, Sriyankar
Author_Institution :
Comput. Sci. & Eng., West Bengal Univ. of Technol., Kolkata, India
Abstract :
Meta-heuristics for solving Combinatorial Optimization Problems (COP) is a rapidly growing field of research. In this paper we have considered the Resource Constrained Project Scheduling Problem as a COP. The problem is highly constrained and is a common problem for many construction projects. The problem is NP-hard and deterministic methods are slow in execution. In our work, we use Simulated Annealing, Tabu Search, Genetic Algorithm, Particle Swarm Optimization and Elite Particle Swarm Optimization with Mutation for solving benchmark instances of this problem and compare their performances with each other. The results show that Simulated Annealing outperforms other methods in getting optimal results with minimum number of fluctuations.
Keywords :
construction industry; genetic algorithms; particle swarm optimisation; project management; resource allocation; scheduling; search problems; simulated annealing; Elite particle swarm optimization; NP-hard problem; Tabu search; combinatorial optimization problems; genetic algorithm; metaheuristic approach; resource constrained project scheduling problem; simulated annealing; Genetic algorithms; Job shop scheduling; Particle swarm optimization; Processor scheduling; Schedules; Simulated annealing; Local Search; Meta-heuristics; Particle Swarm Optimization; Resource Constrained Project Scheduling; Simulated Annealing; Tabu Search;
Conference_Titel :
Computer Science and Automation Engineering (CSAE), 2011 IEEE International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-8727-1
DOI :
10.1109/CSAE.2011.5952511