DocumentCode :
2287826
Title :
A New Structure for Electricity Market Scheduling
Author :
Soleymani, S. ; Ranjbar, A.M. ; Shirani, A.R.
Author_Institution :
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran
fYear :
2006
fDate :
12-15 Dec. 2006
Firstpage :
1
Lastpage :
5
Abstract :
On pool market structure, the generating units are typically dispatched in order of lowest to highest bid as needed to meet demand requirement as well as considering network constraints. Generally, no account is taken of generating unit´s reliability when scheduling them. This paper proposes a new structure for electricity market to consider generating unit´s reliability in the scheduling problem. GAMS (general algebraic modeling system) language has been used to solve the social welfare maximization problem using CPLEX optimization software with mixed integer programming.
Keywords :
integer programming; power generation dispatch; power generation reliability; power generation scheduling; power markets; power system analysis computing; CPLEX optimization software; GAMS language; demand requirement; electricity market scheduling; general algebraic modeling system; generating unit dispatch; mixed integer programming; network constraints; reliability; social welfare maximization problem; Costs; Economic forecasting; Electricity supply industry; Job shop scheduling; Linear programming; Maintenance; Power generation; Power system modeling; Power system reliability; Power system security; Electricity Market; Generating Units; Power Generation Scheduling; Reliability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Electronics, Drives and Energy Systems, 2006. PEDES '06. International Conference on
Conference_Location :
New Delhi
Print_ISBN :
0-7803-9772-X
Electronic_ISBN :
0-7803-9772-X
Type :
conf
DOI :
10.1109/PEDES.2006.344321
Filename :
4148028
Link To Document :
بازگشت