Cascading failures in large rectifiers or the myth of N-1
Author :
Galloway, James H.
Author_Institution :
J.H. Galloway & Associates, Brookfield, CT, USA
fYear :
2005
fDate :
12-14 Sept. 2005
Firstpage :
129
Lastpage :
132
Abstract :
Large rectifiers depend on the parallel operation of significant numbers of parallel devices, either diodes or SCRs. Protection systems against cascading failure range from periodic visual inspection of an indicating system, to a wide variety of automatic alarm/trip systems. Historically, many of these systems have experienced cascading failures in spite of these systems, sometimes with catastrophic results. Many times, these failures occur only after many years of trouble free operation, when personnel fully aware of the system are no longer available. This paper will attempt to simulate this type of failure by using a matrix of thermal models for the fuses and devices. Statistical variations are entered to investigate the conditions leading to cascade failure, and the rates of the resulting cascade. Implications for protection systems and maintenance requirements are discussed.
Keywords :
diodes; electrical faults; maintenance engineering; rectifiers; statistical analysis; thyristors; SCR; automatic alarm systems; cascading failure; diodes; large rectifiers; maintenance requirements; parallel devices; periodic visual inspection; protection systems; statistical variations; thermal models; trip systems; Current measurement; Fuses; Leg; Power system faults; Power system protection; Rectifiers; Thermal resistance; Thyristors; USA Councils; Voltage; Cascade failure; Current sharing; Fuse; Rectifier;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Petroleum and Chemical Industry Conference, 2005. Industry Applications Society 52nd Annual
ISSN :
0090-3507
Print_ISBN :
0-7803-9272-8
Type :
conf
DOI :
10.1109/PCICON.2005.1524548
Filename :
1524548
Link To Document :
بازگشت