Title :
In Day-Ahead electricity load forecasting
Author :
Klempka, Ryszard ; Swiatek, Boguslaw
Author_Institution :
AGH-Univ. of Sci. & Technol., Cracow, Poland
Abstract :
Growing competition on goods and utilities markets forces dramatic search for production costs reductions. Electricity costs are the principle cost components in steel industry. In many cases, it is even the main cost of the whole production. One of the main way of the electricity cost minimization is hourly load forecasting. In this paper the algorithm of hourly electricity load forecasting for Polish large steel factory is presented.
Keywords :
cost reduction; load forecasting; power markets; steel industry; Polish large steel factory; day-ahead electricity load forecasting; electricity cost minimization; hourly load forecasting; principle cost component; production cost reduction; steel industry; utilities markets; Costs; Cranes; Energy consumption; Internet; Lighting; Load forecasting; Metals industry; Predictive models; Production facilities; Steel; electricity load forecasting;
Conference_Titel :
Electrical Power Quality and Utilisation, 2009. EPQU 2009. 10th International Conference on
Conference_Location :
Lodz
Print_ISBN :
978-1-4244-5171-5
Electronic_ISBN :
2150-6655
DOI :
10.1109/EPQU.2009.5318805