DocumentCode
2295205
Title
Design and commissioning of a 5 MVA, 2.5 MWh battery energy storage system
Author
Miller, N.W. ; Zrebiec, R.S. ; Hunt, G. ; Deimerico, R.W.
Author_Institution
GE Power Syst. Eng. Dept., Schenectady, NY, USA
fYear
1996
fDate
15-20 Sep 1996
Firstpage
339
Lastpage
345
Abstract
Momentary and sustained power interruptions are some of the most difficult and important power quality problems facing many industrial and commercial users. Battery energy storage systems (BESS) have the potential to provide versatile solutions to this problem for utility, industrial and commercial applications. This paper describes the design and commissioning of a 5 MVA, 2.5 MWh BESS which is now in operation at the GNB Battery Recycling Plant in Vernon, California. The BESS at Vernon provides the required power combined with both voltage and frequency control to allow the plant to tolerate disconnection from the utility grid without suffering unacceptable impacts on critical loads
Keywords
battery storage plants; energy storage; frequency control; power supply quality; power system control; secondary cells; voltage control; 2.5 MWh; 5 MVA; California; GNB Battery Recycling Plant; Vernon; battery energy storage system; commercial users; frequency control; industrial users; power interruptions; power quality problems; voltage control; Active filters; Batteries; Buildings; Computerized monitoring; Energy storage; Industrial power systems; Microcomputers; Recycling; Samarium; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference, 1996. Proceedings., 1996 IEEE
Conference_Location
Los Angeles, CA
Print_ISBN
0-7803-3522-8
Type
conf
DOI
10.1109/TDC.1996.545957
Filename
545957
Link To Document