• DocumentCode
    2295205
  • Title

    Design and commissioning of a 5 MVA, 2.5 MWh battery energy storage system

  • Author

    Miller, N.W. ; Zrebiec, R.S. ; Hunt, G. ; Deimerico, R.W.

  • Author_Institution
    GE Power Syst. Eng. Dept., Schenectady, NY, USA
  • fYear
    1996
  • fDate
    15-20 Sep 1996
  • Firstpage
    339
  • Lastpage
    345
  • Abstract
    Momentary and sustained power interruptions are some of the most difficult and important power quality problems facing many industrial and commercial users. Battery energy storage systems (BESS) have the potential to provide versatile solutions to this problem for utility, industrial and commercial applications. This paper describes the design and commissioning of a 5 MVA, 2.5 MWh BESS which is now in operation at the GNB Battery Recycling Plant in Vernon, California. The BESS at Vernon provides the required power combined with both voltage and frequency control to allow the plant to tolerate disconnection from the utility grid without suffering unacceptable impacts on critical loads
  • Keywords
    battery storage plants; energy storage; frequency control; power supply quality; power system control; secondary cells; voltage control; 2.5 MWh; 5 MVA; California; GNB Battery Recycling Plant; Vernon; battery energy storage system; commercial users; frequency control; industrial users; power interruptions; power quality problems; voltage control; Active filters; Batteries; Buildings; Computerized monitoring; Energy storage; Industrial power systems; Microcomputers; Recycling; Samarium; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference, 1996. Proceedings., 1996 IEEE
  • Conference_Location
    Los Angeles, CA
  • Print_ISBN
    0-7803-3522-8
  • Type

    conf

  • DOI
    10.1109/TDC.1996.545957
  • Filename
    545957