Abstract :
In the last couple of years a lot of changes were experienced in the European electricity market. The European Commission is committed to develop the internal electricity market for Europe. The process is going on but several difficulties are identified. These barriers are technical - missing interconnections, limited cross-border transmission capacities, NTC-based capacity calculation -, legal-commercial - old long term commercial contracts, different regulatory competences, administrative provisions - and political ones. This short study tries to describe them and summarize their effects.
Keywords :
electrical contracting; government policies; law; power markets; power system economics; Central Eastern Europe; NTC-based capacity calculation; cross-border transmission capacity; electricity markets; legal-commercial contracts; missing interconnections; technical barriers; Contracts; Couplings; Electricity supply industry; Energy management; Europe; Guidelines; Legislation; Power generation; Power markets; Wind energy generation; cross-border electricity trading; market entry barriers; market integration; regional electricity markets;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electricity Market, 2008. EEM 2008. 5th International Conference on European
Conference_Location :
Lisboa
Print_ISBN :
978-1-4244-1743-8
Electronic_ISBN :
978-1-4244-1744-5
Type :
conf
DOI :
10.1109/EEM.2008.4579021
Filename :
4579021
Link To Document :
بازگشت