DocumentCode :
2304737
Title :
The management of testing of large systems
Author :
Plowman, R.J.
Author_Institution :
Rolls-Royce plc, Derby, UK
fYear :
1994
fDate :
5-7 Sep 1994
Firstpage :
58
Lastpage :
64
Abstract :
This paper examines the EMC testing and qualifying of a large industrial plant. There are a number of aspects to be addressed when EMC qualifying large distributed systems. These range from the control plan and EMC assessment, to the actual test methods. All major aspects of the control plan are discussed, including management/organisation, design, risk assessment, testing and test standards. To help with EMC risk assessment the concept of the EMC analysis sheet is introduced together with its evolution in parallel with the plant design. The paper also addresses site testing and one of the main site tests, bulk current testing, particularly the long line test
Keywords :
electromagnetic compatibility; measurement standards; EMC analysis sheet; EMC assessment; EMC testing; bulk current testing; control plan; large distributed systems; large industrial plant; large systems; long line test; management/organisation; plant design; risk assessment; site testing; test methods; test standards;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electromagnetic Compatibility, 1994., Ninth International Conference on
Conference_Location :
Manchester
Print_ISBN :
0-85296-622-9
Type :
conf
DOI :
10.1049/cp:19940676
Filename :
346648