• DocumentCode
    2312869
  • Title

    On gradient estimation of scheduling for multi-cluster tools with general robot moving times

  • Author

    Chan, Wai Kin Victor ; Roeder, Theresa M.

  • Author_Institution
    Dept. of Ind. & Syst. Eng., Rensselaer Polytech. Inst., Troy, NY, USA
  • fYear
    2010
  • fDate
    21-24 Aug. 2010
  • Firstpage
    112
  • Lastpage
    117
  • Abstract
    This paper introduces three methods to deriving gradient estimators of system performance of multi-cluster tools. A multi-cluster tool is composed of multiple single cluster tools connected non-cyclically through intermediate buffer modules. Each single cluster has a separate robot for transporting wafers within the cluster and in and out of the cluster. The coordination among these robots poses a challenge in system-performance analysis and optimal scheduling. This paper focuses on two-cluster tools and develops three approaches (formula-based, linear programming-based, and regression-based) for estimating the gradient of the throughput or any activity times with respect to all timing parameters.
  • Keywords
    cluster tools; gradient methods; industrial robots; linear programming; regression analysis; scheduling; formula-based approach; general robot moving times; gradient estimation; intermediate buffer module; linear programming; multicluster tools; optimal scheduling; regression-based approach; system performance; timing parameter; Job shop scheduling; Loading; Optimal scheduling; Robot kinematics; Schedules; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2010 IEEE Conference on
  • Conference_Location
    Toronto, ON
  • Print_ISBN
    978-1-4244-5447-1
  • Type

    conf

  • DOI
    10.1109/COASE.2010.5584704
  • Filename
    5584704