DocumentCode
2312869
Title
On gradient estimation of scheduling for multi-cluster tools with general robot moving times
Author
Chan, Wai Kin Victor ; Roeder, Theresa M.
Author_Institution
Dept. of Ind. & Syst. Eng., Rensselaer Polytech. Inst., Troy, NY, USA
fYear
2010
fDate
21-24 Aug. 2010
Firstpage
112
Lastpage
117
Abstract
This paper introduces three methods to deriving gradient estimators of system performance of multi-cluster tools. A multi-cluster tool is composed of multiple single cluster tools connected non-cyclically through intermediate buffer modules. Each single cluster has a separate robot for transporting wafers within the cluster and in and out of the cluster. The coordination among these robots poses a challenge in system-performance analysis and optimal scheduling. This paper focuses on two-cluster tools and develops three approaches (formula-based, linear programming-based, and regression-based) for estimating the gradient of the throughput or any activity times with respect to all timing parameters.
Keywords
cluster tools; gradient methods; industrial robots; linear programming; regression analysis; scheduling; formula-based approach; general robot moving times; gradient estimation; intermediate buffer module; linear programming; multicluster tools; optimal scheduling; regression-based approach; system performance; timing parameter; Job shop scheduling; Loading; Optimal scheduling; Robot kinematics; Schedules; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering (CASE), 2010 IEEE Conference on
Conference_Location
Toronto, ON
Print_ISBN
978-1-4244-5447-1
Type
conf
DOI
10.1109/COASE.2010.5584704
Filename
5584704
Link To Document