Abstract :
Traditionally corona testing has been performed in laboratories by mounting a single phase mock-up of the conductor/hardware/insulator assembly at a given height above the ground and applying 110% of the rated line-to-ground operating voltage. If the test setup is shown to be free of corona by this test, then it is considered that the assembly will be free of corona under operating conditions. This method does not appear in any standards, but is used as a generally accepted test method. In spite of its general acceptance, this test method can give erroneous results. This is due to the fact that the inception of corona occurs at a given electric field gradient rather than a given absolute voltage. Under actual operating conditions, the electric field gradient at the conductor/hardware/insulator assembly is a function of phase spacing, the local geometry, and the applied 3-phase voltage. In order to correctly perform such a test in a laboratory, it is essential that the maximum gradients occurring on the conductors in the field be reproduced in the laboratory test. To address this shortcoming in test procedures, the IEEE PES Transmission and Distribution Committee´s Lightning and insulator and corona and field effects working groups are engaged in the development of a guide for the performance of visual corona and RIV testing on insulator assemblies and line hardware.This paper describes the theoretical and experimental background upon which the technical development of the guide is based, and the application of the procedures in the guide as used in testing insulator assemblies and hardware for a new design 6-conductor bundle 765 kV transmission system.
Keywords :
IEEE standards; corona; electric field gradient; insulator testing; power transmission lines; 3-phase voltage; Distribution Committee´s Lightning; IEEE PES Transmission; IEEE guide; electric field gradient; line hardware; line-to-ground operating voltage; phase spacing; transmission line insulator assemblies; visual corona testing; voltage 765 kV; Assembly; Conductors; Corona; Hardware; Insulation; Insulator testing; Laboratories; System testing; Transmission lines; Voltage; Insulator/line hardware testing; Radio Influence Voltage; Visual corona testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology and IEEE Power India Conference, 2008. POWERCON 2008. Joint International Conference on
Conference_Location :
New Delhi
Print_ISBN :
978-1-4244-1763-6
Electronic_ISBN :
978-1-4244-1762-9
Type :
conf
DOI :
10.1109/ICPST.2008.4745383
Filename :
4745383
Link To Document :
بازگشت