The application of PCA-fuzzy probability analysis on risk evaluation of construction schedule of highway
Author :
Xia, Liming ; Zhao, Chunxue
Author_Institution :
Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
Volume :
2
fYear :
2010
fDate :
9-10 Jan. 2010
Firstpage :
1230
Lastpage :
1234
Abstract :
Firstly, through the analysis of the life cycle of a highway project, this paper identified risks influencing construction schedule which set up a foundation for further establishment of a risk index system. Secondly, based on the established risk index system, this paper calculated and evaluated indicators of risks identified through probability analysis and fuzzy logic methods which became simpler after adoption of principal component analysis (PCA). Finally, the PCA-fuzzy probability analysis method is proved feasible and practicable by case study.
Keywords :
fuzzy logic; principal component analysis; probability; risk analysis; road building; PCA-fuzzy probability analysis; foundation; fuzzy logic; highway construction schedule; highway project; principal component analysis; risk evaluation; risk index system; Equations; Fault diagnosis; Fuzzy logic; Principal component analysis; Project management; Risk analysis; Risk management; Road transportation; Scheduling; Technology management; Construction Schedule; Fuzzy Logic Method; Highway Projects; Principal Component Analysis; Probability Analysis; Risk Index System;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-7331-1
Type :
conf
DOI :
10.1109/ICLSIM.2010.5461157
Filename :
5461157
Link To Document :
بازگشت